This project was completed for our long standing & valued client Partek Constructions in 2018. The project was completed over 2x stages comprising of the Maintenance Shed & Senior Learning Centre.
The Maintenance Building was constructed in the existing student carpark with a footprint of 440 square metres, the Old Maintenance shed was demolished to make way for the new Senior Learning Centre (SLC). The state of the art two-storey Learning Centre includes 13 new general learning areas, a lecture theatre, hospitality areas, staff offices, IT classrooms and a café. The SLC building has steelwork holding up both the 1st floor concrete slab fabricated out of heavy welded beam sections (WB’s) & a more conventional structure supporting the large roof area. Some other highlights of the Steelwork include the cranked floor beams supporting the Lecture theatre seating, curved Fascia beams for the large glazed façade & V-Shaped Entry columns that support the soffit & form the bold & striking exterior.
We were pleased to deliver this important project for Partek Constructions on time and on budget. This project was a successful collaboration between Lincoln/Partek/Edge Architects/PT Design on the back of some previous projects of similar stature & the second building Lincoln Engineers has constructed at the St. Michaels secondary campus.
I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.